To provide Grade 3 waterproofing and ground gas protection to Birmingham Conservatoire, Birmingham’s premier music school.
Read more
To provide structural waterproofing on a prestigious, modern private development in North Wood, London. Contiguous piles were utilised to optimise the space available.
Read more
A new development of an 11 storey, 270 bed student accommodation scheme including leisure facilities at ground floor level, built on the site of the old Bristol Post newspaper printing press hall.
Read more
To achieve a Grade 2/3 environment in a new build 8 story office development located in Bristol’s vibrant Temple Quarter Enterprise Zone.
Read more
atal was approached by the architect for this high prestige project near St Issey, Cornwall at design stage to propose a waterproofing system for a full basement.
Read more
The construction of Bath Spa University’s new ‘commons’ building was part of a £40 million renovation plan for Bath Spa University.
Read more